Area 3

31.6㎢

  • Northern area of Byeonsanbando National Park
  • Tourism Convergence – waterfront tourism / leisure, combined tourism and new industry based on new technology

Functions

  • Aquatic leisure complex and a stay-type tourist complex in consideration of demand from private investors and promotion of business
  • Aquatic leisure clustered with tourism, shopping, and cultural facilities around the Circular Bridge, considering its commercial functions
3권역 도입기능 배치 및 공간구조구상 예시
Layout and spatial structure in area 3

Planned indicators for area 3

Planned indicators for area 3
Category Unit(㎢) Planned indicators Remarks
Planned area 31.6 7.2 ㎢ of Eco-Area
Population and No. of households Planned population Persons 55,300
Planned No. of households households 26,300 2.1 people / household
Schools Elementary school Open school 6 1/ area
Middle and high school Open school 5 1 school / residential area
Urban infrastructure Public facilities Facility 3 1 facility / residential area
Park and Greenery % 17 business site
Public utility services Water supply % 100.0
Sewage treatment Facility 2 sewage treatment
Waste treatment Facility 1 MBT+SRF, Landfill
Heating system Facility 1 1 / area
Gas supply Facility 1 1 / area

*A planning indicator is to set up the direction of development and the specific installation of facilities which can be adapted within the plan for the installation of large-scale infrastructure, etc. based on the project.

**Set standards of relevant laws appropriate to each development project

  • 3권역 토지이용 구상 예시
    Land use planning in area 3
  • 3권역 교통체계 구상 예시
    Transportation system in Area 3
  • 3권역 생활권 설정 예시
    Living area in area 3
  • 체류형 관광단지 개발방향 예시
    Tourism complex with a stay-type development direction
공유하기